Innovation In Pressure Tube Life Assessment
B. Guler, D. Kalenchuk, A. Celovsky (AECL)
Development Of A Finite Element Modal Model For A CANDU Fuel Channel
J. Park, BS. Kim, JH. Lee, GY. Park (KAERI), CJ. Kim (KHNP)
1b: Water Upgrading
Combined Electrolysis And Catalytic Exchange (CECE) Technology - An Economical Alternative For Heavy Water Upgraders Using Water Distillation
D. Ryland, R. Sadhankar (AECL)
Catalytic Removal Of Dissolved Oxygen For Nuclear And Non-Nuclear Applications
S. Suppiah, D. Burns, C. Aelick (AECL)
1c: Performance and Plant Life Improvement - 1
ECCS Strainers - From Design To Installation
D. Rhodes, A. Eyvindson, N. Fisher (AECL), A. Criminisi (OPG)
Improved Station Performance Through The Use Of Sub-Micron Filters
W. Walker (Pall Canada), D. Guzonas (AECL), G. Svarovsky (OPG)
1d: Steam Generator Life Management
Steam Generator Life Management
P. King, R. McGillivray, W. Reinhart, J. Millman, B. King (BWC)
Steam Generator Return To Service Following Extended Layup
J. Sherin (BP), R. Tapping, S. Roy (AECL)
Maintenance And Life Management Of Steam Generators At EMBALSE Nuclear Power Station
R. Sainz, G. Diaz, H. Sveruga (NASA), T. Ramakrishnan, S. Azeez (AECL)
2a: Fuel Channels and End Fittings - Inspections
Fuel Channel Diameter Creep Measurement Using A Modified Slarette Tool
G. Rousseau, J. Bherer, C. Tremblay, M. Drouin (HQ)
Hydro-Québec MED (Diametric Expansion Measurement)
J. Bherer, C. Tremblay (HQ)
Tools For Computer-Assisted Analysis Of Fuel Channel Inspection Data
T. Joulin, D. Horn, T. Krause, K. Chaplin, D. Dunford, E. Long (AECL)
2b: Maintenance Programs - 1
Program Strategies For Maintenance Management, Organization & Planning
J. Czegeny (OPG)
Nuclear Maintenance Work Volume Model M. Thibeault (OPG)
Pickering A - Ontario Power Generation Rotating Equipment PDM Integrated Reporting
K. Slater, P. Reitknecht (OPG)
2c: Performance and Plant Life Improvement - 2
Innovation to Reality For Improved Pump Seal Performance
W. Wong, A Eyvindson, D. Rhodes (AECL)
Inflatable Airlock Door Seals For Improved Performance
T. Sykes, K. Weisenberg, R.Yeung, F. Briscoe (AECL)
2d: Feeder Inspections
Development Of Ultrasonic Techniques For Feeder Cracking Inspection At Gentilly-2
G. Rousseau, J. Coté, G. Lepage, E. Lavoie (HQ)
On The Development Of The Métar Family Of Inspection Tools
E. Lavoie, G. Rousseau, L. Reynaud (HQ)
3a: Inspection Technology - Fuel Channels
Implementation Of Advanced Spacer Detection And High Accuracy Gap On SLAR
T. Krause, J. Schankula, T. Joulin, S. Craig (AECL)
Fuel Channel Inspection With AFCIS
W. Mayo, G. Van Drunen, D. Kalenchuk, R. Gunn (AECL)
Modification Of Gentilly-2 Slarette Inspection System For Delivering OPG’s ANDE Inspection Tools
M. Cantin, G. Rousseau, J. Bherer (HQ), J. Drossis, G. Jarvis (OPG)
3b: Maintenance Programs - 2
Using Systematic Aging Assessments To Improve Effectiveness Of Plant Maintenance Programs
R. Dam, P. Watson, J. Yang, J. Nickerson (AECL)
Maintenance Optimization At Bruce Power
K. Ellis, R. Tout (BP)
3c: Performance and Plant Life Improvement - 3
Cernavoda NPP Plant Life Management (PLiM) Program
V. Krishnan, R. Dam, J. Nickerson (AECL), P. Barbulescu, E. Moldoveanu, M. Serban, L. Delcea (SNN Romania)
Refurbishment Programs
C. Irish (Nuclear Logistics)
Benefits Of A Systematic Approach To Maintenance For Safety And Safety-Related Systems
R. Dam, S. Ayazzudin, J. Nickerson (AECL)
3d: Feeder Assessment and Mitigation - 1
Overview Of Feeder Issues T. Gendron (AECL)
Evaluation Of Options For Life Cycle Management Of Feeder Cracking At The Point Lepreau Generating Station
T. Gendron (AECL), J. Slade (NBP)
Use Of Depleted Fuel As A Mitigation Method For Reducing FAC In Selected Channels
G. Rousseau, D. Brissette (HQ)
4a: Feeder Assessment and Mitigation - 2
Assessment Of CANDU Feeders Subject To Flow Accelerated Corrosion
S. Iyer (AECL), J. Slade (NBP)
Remaining Life Assessment Of Pickering A Primary Heat Transport Outlet Feeder Elbows
W. Lee, T. Lau, P. Floyd (OPG), C. Schefski (AECL)
Light Water In-Reactor Loop Experiments To Support A CANDU HTS pHa Specification For Minimizing Feeder Wall Thinning
A. Elliot, M. Godin, Z. Walker (AECL)
4b: Valve Maintenance
Hardfacing And Packings For Improved Valve Performance
J. Aikin, J. Patrick, I. Inglis (AECL)
Alternative Packing Solutions For Manual And Modulating Valves
W. Igel (LATTY International)
New Developments In Valve Stem Sealing W. Igel (LATTY International)
4c: Inspection Technology - Steam Generators
Overview Of Eddy Current Inspection Technology For CANDU SG Tubing
L. Obrutsky, M. Mirzai (AECL)
Advances In Analysis Of Eddy-Current Data From Steam Generator Inspections
D. Horn, R. Roiha, J. Lu (AECL)
Pre-Service Baseline Inspection Using X-Probe of Oconee Replacement Steam Generators
M. Addario, P. Shipp (BWC), K. Davis (Duke Energy), C. Fogal (R/D Tech)
4d: Instrumentation & Control
I&C Upgrading At Nuclear Power Plants
A. Tamiri (OPG)
Testing The Dynamics Of Shutdown Systems Instrumentation In Reactor Trip Measurements
O. Glöckler (OPG)
Electrical And C&I Maintenance At Cernavoda NPP
S.Hada, S.Voiculescu, D. Bigu (SNN Romania)
5a: Fuel Channels and End Fittings - Universal Delivery Machine
Design Of The Bruce And Darlington Universal Delivery Machine Heads
M. Gray (GEC), R. Brown (OPG)
Pickering UDM Transportation System
P. Brennan, J. Vissers (GEC), R. Brown (OPG)
Digital Motion Control For Ontario Power Generation’s Universal Delivery Machine
D. Murray (GEC), A. Roberts (OPG)
5b: Inspection Technology
Shutdown Cooling Heat Exchanger Leak Found By X-Probe
M. Cantin (HQ), R. Lakhan (RD Tech)
Recent Applications Of Phased Array Inspection For Turbine Components And Welded Structures
P. Ciorau, D. MacGillivray, R. Hanson (OPG)
Identification And Management Of Cracking In 410 Stainless Turbine Blade Roots
M. Clark, E. Lehockey, I. Thompson, R. Massey (Kinectrics)
5c: Steam Generator Modifications
Steam Generator Thermal Sleeve Reconstruction
E. Caton, A. Askari, P. Volder (BWC)
Steam Generator Modifications And Repairs At Wolsong, Cernavoda, & Qinshan
J. Vandenberg, R. Kizhatil, P. Caple (BWC)
Auxiliary U-Bend Support Retrofit
B. Horvath, S. Fluit, R. Kizhatil (BWC)
5d: Fuel Handling
Mechanism Of Crud Migration Into The Fuelling Machine And Its Effects
T. Sie (OPG)
Darlington Nuclear Fuelling Machine System Monitoring
T. Sie (OPG)
Fouling Issues Within CANDU Fuel Bay Purification Systems
P. Angell (AECL), J. Murray (OPG)
6a: Fuel Channels and End Fittings - Maintenance
Reactor Inspection & Maintenance Machine Senses And Homes In On Reactor End Fittings - Summary
R. Fell (GEC), R. Brown (OPG)
Feeder Hub Refurbishment To Reduce D2O Leakage
B. Smith, H. de Boer, A. Duerden, D. Benton (AECL), O. Lepik (OPG)
6b: Steam Generators - Inspections
Pickering A Steam Generators - Inspection Of Boiler Feedwater Nozzles And Thermal Sleeves
C. Schefski (AECL), P. Floyd, T. Lau (OPG)
Tube To U-Bend Support Bar In-Situ Clearance Measurement
P. Shipp, R. Klarner, W. Schneider, M. Addario (BWC)
6c: Steam Generators - Assessments
Review Of Failures Of Recirculating Steam Generator Internals Due To Flow-Accelerated Corrosion
J. Pietralik (AECL)
A Technique To Infer Steam Generator Fouling Factors From Tube Deposit Loading
M. Yetisir, S. Laroche, C. Turner (AECL)